2 Sets of YUNENG 20,000L/h UHV Oil Purifiers Installed at ±800kV Poyang Lake Converter Station
At the beginning of this month, we received good news from Jiangxi Province. At Poyang Lake Converter Station, YUNENG became the big winner for 2 set of 20,000L/h UHV oil purifiers after 1 month onsite running competition. We defeated other two competitors with huge advantages. The performance, running data of our oil purifiers are much superior to others. Thanks for the trust of State Grid, Jiangxi Power Transmission and Transformation Company. Y UNENG will keep on making contribution to the construction of UHV.
Basic Introduction of Yazhong—Jiangxi ±800kV UHV DC Project
Length: 1696 kilometers
Voltage level: ±800 kV
Rated transmission capacity: 8 million kilowatts
Starting point: Yalong River Converter Station in Liangshan Prefecture, Sichuan Province
End point: Poyang Lake Converter Station in Fuzhou City, Jiangxi Province
Passing provinces: Sichuan, Yunnan, Guizhou, Hunan, Jiangxi
Yazhong – Jiangxi ±800 kV UHV DC project is a clean energy channel for State Grid Corporation to promote green and low-carbon energy transformation construction by connecting the hydropower base in the middle reaches of Yalong River with Sichuan power grid at the sending end, and Jiangxi load center with central China power grid at the receiving end.
The surging electricity from the hydropower base in the middle reaches of the Yalong River will instantly light up the lights of Poyang Lake and rural areas along the silver line of the tower.